Zümra Timur

Landscape Architect · Peyzaj Mimarı

Aerial concept visualisation of forest lodging around Sinekli Lake.
Forest lodging aerial

Academic recreation landscape

Sinekli Gol Recreation

FOREST · WATER · RECREATION LANDSCAPE

An academic recreation landscape proposal organised around Sinekli Lake, combining camping, social clearings, sports courts and quiet water-edge experiences.

Location
Küçük Sinekli · Silivri · İstanbul
Bungalows
20
Camp clearings
2 × 2,000 m²
Tents
14
Estimated stay capacity
102+ users

Forest lodging

A path read through light.

The aerial view reveals a pedestrian spine linking the lodging units without breaking the forest canopy. Low-level lighting clarifies the main route and shared thresholds while preserving continuous areas of darkness.

Aerial concept visualisation of forest lodging around Sinekli Lake.
Forest lodging aerial

Project premise

A lake held by forest.

The proposal is organised as a sequence of clearings around Sinekli Lake. Arrival, accommodation, camping, family recreation and water access remain distinct, but they are connected by one continuous woodland route.

Lakeside viewing deck at sunset within the forest.
Lakeside viewing deck

Forest frame

Dense evergreen planting defines the project boundary and holds each programme clearing.

Distributed uses

Active and quiet functions are separated spatially, then reconnected by the circulation loop.

Water orientation

The lake remains the visual reference point for routes, decks, picnic areas and social spaces.

Site reading

Road, basin, forest.

Public mapping and the supplied drawings place the lake north of Küçük Sinekli, inside a continuous forest landscape linked to the Danamandıra-Sinekli and Büyük Sinekli road network. The maps are used as context only, not as survey data.

Access

A short local spur connects the lake to the main road system; vehicle arrival is held outside the quietest water-edge spaces.

Forest

Satellite imagery shows a continuous canopy broken by narrow tracks and existing clearings — the basic spatial material of the proposal.

Terrain

The supplied topographic map places the lake within an undulating basin around the visible 200 m contour, rather than on a flat open field.

Design strategy

Six zones, one loop.

The supplied plan is reorganised as six readable systems. The overlay does not change geometry; it clarifies how arrival, lodging, camping, day-use, activity and support functions relate to the lake.

  1. A

    Arrival + service thresholds

    Two gate points connect parking, security and staff/service access.

  2. B

    Caravan + bungalow belt

    Caravan spaces follow the western approach; 20 bungalows mix paired, tripled and standalone units.

  3. C

    Camp groves

    Two 2,000 m² clearings hold 7 tents each; maximum 3 users per tent.

  4. D

    Lakeside day-use

    Picnic, pergola, seating and fishing-deck uses face the lake.

  5. E

    Activity clearing

    Play and sports functions form the active public core.

  6. F

    Distributed support nodes

    Kitchen, laundry, WC/shower, health and security units sit along the loop.

Water edge

Water as arrival and pause.

The waterfront is not treated as one continuous hard edge. Active arrival happens through a canoe approach, while quieter seating is gathered beneath the pergola as a slower, sheltered viewing room.

Canoe approach across Sinekli Lake at sunset.
Canoe approach + water arrival
Sheltered waterfront pergola overlooking the lake.
Sheltered waterfront pause

Shared ground

Family ground under canopy.

Play and picnic functions are set into clearings within the woodland rather than pressed directly onto the waterfront. This keeps family activity visible, shaded and comfortably connected to the main loop.

Picnic terrace under the forest canopy.
Picnic terrace
Play clearing framed by mature trees.
Play clearing

Movement + activity

Activity contained by trees.

The sports courts form a concentrated active node within the woodland. The surrounding tree mass screens this use from quieter zones and keeps recreation embedded within the forest frame.

Sports clearing contained by the forest edge.
Sports clearing

Visitor sequence

Orientation across distributed uses.

Because the programme is dispersed, the project depends on a clear hierarchy of paths, destination names and water-facing pauses. Wayfinding turns the site programme into a readable visitor sequence.

Wayfinding sign for distributed recreation uses.
Distributed programme wayfinding
Family pause overlooking the lake.
Water-facing pause

Forest route

A clear path through the canopy.

The movement corridor is one of the project’s clearest spatial ideas. A direct path cuts through the conifer mass, producing long sightlines and a consistent shaded experience for walking and running.

Continuous walking route through the conifer forest.
Continuous forest route

Zümra Timur · Landscape Architect

Night use

A quiet night around the fire.

Tent clusters gather loosely around shared fire circles and low path lights. Social clearings remain distinct, while the forest silhouette and dark sky continue to frame the scene.

Camp clearing after dark with low lighting and fire circles.
Camp after dark
Camp clearing after dark with low lighting and fire circles.
Camp after dark

Camping after dark

Warm lights inside a dark forest frame.

The night scene closes the portfolio by showing how the camping programme can remain social and atmospheric without overpowering the surrounding woodland. Small pools of light, fire circles and low path lights create intimacy rather than spectacle.

Images are concept visualisations. Portfolio diagrams are editorial interpretations derived from supplied SKP, DWG, PDF and image references; they are not construction drawings. Public mapping is used as context only, not as survey data.

  • SKP · DWG · PDF · PNG/JPG
  • Editorial case-study presentation